Pre Shipment Inspection (after production & before transport)

This procedure will be performed when the modules are finished and takes place after production is complete but before container loading of modules and transport.
This customized quality inspection (CQI) consists steps:

  • BOM/CDF cross-checking / Conformity verification of all primary materials
  • Inspection of final module samples
  • Packing & Loading supervision